CIT Construction Software Estimating

View Datasheet as PDF |
|
| |
Request Information |
| |
|
The CIT estimating solutions suite encompasses all functionality required to describe, quantify and price work whatever the route to project procurement. The system has been designed with all practical functions to support both traditional and design and build tendering, complete with all levels of detailed measurement and pricing capabilities.
Supporting and integral to the core estimating application is a detailed package management module, enabling sub-contract and materials packages to be compared, analysed, selected and used. This module itself is supported by an integral vendor database, that speeds up the production of pre & post contract enquiries against your QA approved sub-contractors and suppliers.
All expected estimating functionality have been carefully engineered into the system harnessing the latest Windows™ technologies to speed up the tendering process without compromising audit and control. Traditional keyboard control is now supported by 'drag and drop', familiar Windows Explorer™ and Excel™ spreadsheet views and dynamic links to common Office applications.
Headline Functions
- Project set-up & classification
- Key tender dates
- Key contract information & contract dates
- Bid team information
- Historical analysis/ competitor information
- Full BQ navigation and control (ability to name & repackage the original BQ to any level). This includes unlimited resource and bill item level filters to group 'like' work packages/ estimating information together.
- Marking-Up (Sub-Contract & Supplier packages) by individual item, contiguous and non-contiguous selection, whole bills/sections/pages to the entire job. Individual items can be marked/allocated to several packages
- Sub-Contract trade BQ production (inc consolidated views)
- Enquiry Management (inc enquiry letter & trade BQ production)
- Full integral vendor database available.
- In-built trade, area, contract size performed mapping points
- QA & Health & Safety
- Performance
- Resource Estimating (inc true multi-level composite/activity pricing)
- Supporting all common resource output calculation methods
- Ability of describing outputs (e.g. for half brick wall constant = '/ 1000 bricks x 60 bricks per m2') allied to most current/legacy estimating systems working methods
- Clipboard copy & paste functions
- Able to use rates from templates, priced libraries & other completed tenders
- Package Management (Quote input, analysis & selection)
- Sub-Contract
- Input package totals, NIL/INC/UNP/EXC, plug rates, average rates
- Auto-track number of unpriced items & valued of plugged items per quote
- Assignment of quote conditioning factors (e.g. MCD, allowances) on a value (£) or % basis to be spread across the Sub-contract package rates of the selected sub-contractor
- Ability to mix sub-contract (e.g. Labour only quotes) with own labour, plant & material rates. CIT retains all estimator resource pricing against the original BQ items, allowing them to be turned-on as required (e.g. if reverting back to own labour).
- Materials
- Package coded to auto-filter suppliers
- Input materials orders discounts
- Resource Management (inc project resource analysis)
- Find & Replace, Find & Delete, Find & Switch-Off
- View where used
- Detailed estimating administration facilities
- Unpriced Items
- Resource rate query reporting i.e. Where Resource >= £100
- High Value Bill Items
- Net Cost Reporting
- BQ (net, Gross & Blanks BQ's)
- Resource (Resource Requirements, Where Used, Analysis (quantities & costs))
- Sub-Contract Packages (Trade Package analysis, Comparator reporting, Own LPMS versus Sub-Contractor reporting)
- Elemental Cost Analysis
- Tender Adjudication
- Project, Bill, Section, Page, Item, Resource Category to individual resource settlement (Value(£) or percentage based), compounded or un-compounded.
- Information Re-use
- Copy entire projects, sections, items or individual rates as the basis of pricing current tenders.
- Moving information forward into other business processes is controlled, approved and audited via the CIT Project Monitor module to allow definable data sets to be shared with Excel™ and other business systems.
|